The OMNIA® e-meter is designed to save you time and trouble during rollout. Cellular IoT communication eases rollout planning by simply eliminating it. Since the communication infrastructure is already in place, you decide when and where the next meter should be installed.
The user-friendly design of the OMNIA® e-meter has reduced installation time by 1.5 minutes per meter. Connectivity is verified instantly so that the installer doesn’t have to wait around or leave prematurely at the risk of having to revisit the installation. Experience shows that unconfirmed connectivity causes revisits to 3-5% of rural and 1% of urban meter installations at an average cost of EUR 70 per revisit, so reducing the number of revisits can significantly lower the cost of a smart meter rollout.